THE A-SPACE PROSPECTIVE DEVELOPMENT TEAM HISTORY

(website made by Laura Harris)

Hello. This is Laura Harris. One of the Workers of A-Sync. A few years later after our tragic accident i decided to make a website and upload notes and files off our computers in A-Sync to show its timeline. Latest Update Date (September 5 2015)

The Overflow 08/02/72 and 08/04/72

The solar flare of August 1972 were a historically powerful series of solar storms with intense to extreme solar flare, solar particle event, and geomagnetic storm components in early August 1972, during solar cycle 20. The storm caused widespread electric‐ and communication‐grid disturbances through large portions of North America as well as satellite disruptions. On 4 August 1972 the storm caused the accidental detonation of numerous U.S. naval mines near Haiphong, North Vietnam.[1] The coronal mass ejection (CME)'s transit time from the Sun to the Earth is the fastest ever recorded.[2]

Overflow Audio.

Overflow Video with Cinematic & Edited shots.

Reactor Room ██/██/80

1980 (Music).

Prototype 05/10/82

At Oak Ridge National Laboratory On May 10 1982 We decided to test a Prototype.

Prototype Video.

Prototype (Music).

A Job in Silicon Valley ██/██/84

Ivan Beck is moving to Silicon Valley, San Jose in California around 1984 and getting a job as vice director of Async Research Institute. A Job in Silicon Valley (Music).

A Press Confrence 04/██/88

A Press Confrence held in April of 1988 Ivan Beck, vice director of the Async foundation, described the intention of these tests, stating that the program, if granted sufficient backing from the United States government, will offer a solution to all current and future storage and residential needs, and save billions of dollars on property construction and management.

The First Test ██/██/88

On ███ ████ ████ the Async research facility tested its low-proximity magnetic distortion system for the first time. Details regarding the results of the experimentation have not yet been released. A Press Confrence held in April of 1988 Ivan Beck, vice director of the Async foundation, described the intention of these tests, stating that the program, if granted sufficient backing from the United States government, will offer a solution to all current and future storage and residential needs, and save billions of dollars on property construction and management.

The Second Test 06/18/88

On June 18th, 1988 the Async research facility tested its low-proximity magnetic distortion system for the second time. Details regarding the results of the experimentation have not yet been released. A Press Confrence held in April of 1988 Ivan Beck, vice director of the Async foundation, described the intention of these tests, stating that the program, if granted sufficient backing from the United States government, will offer a solution to all current and future storage and residential needs, and save billions of dollars on property construction and management.

The Third Test 07/02/88

On July 2nd, 1988 the Async research facility tested its low-proximity magnetic distortion system for the third time. Details regarding the results of the experimentation have not yet been released. A Press Confrence held in April of 1988 Ivan Beck, vice director of the Async foundation, described the intention of these tests, stating that the program, if granted sufficient backing from the United States government, will offer a solution to all current and future storage and residential needs, and save billions of dollars on property construction and management.

The Third Test Video.

Government Funding (Music).

Government Funding Orchestral Version (Music).

Government Funding V2 (Music).

The Fourth Test ██/██/██

On ███ ████ ████ the Async research facility tested its low-proximity magnetic distortion system for the fourth time. Details regarding the results of the experimentation have not yet been released. A Press Confrence held in April of 1988 Ivan Beck, vice director of the Async foundation, described the intention of these tests, stating that the program, if granted sufficient backing from the United States government, will offer a solution to all current and future storage and residential needs, and save billions of dollars on property construction and management.

The Fifth Test ██/██/██

On ███ ████ ████ the Async research facility tested its low-proximity magnetic distortion system for the fifth time. Details regarding the results of the experimentation have not yet been released. A Press Confrence held in April of 1988 Ivan Beck, vice director of the Async foundation, described the intention of these tests, stating that the program, if granted sufficient backing from the United States government, will offer a solution to all current and future storage and residential needs, and save billions of dollars on property construction and management.

First Contact 10/17/89

This is the Sixth Test for the threshold. And we made our First Contact with what we will call The Back Rooms. During opening the portal to this used dimension. We have also caused the "1989 Loma Prieta earthquake" due to our Threshold.

First Contact Video.

faultline.mov.

Your Done/Daisy Bell (Music).

978041526573 ██/██/██

9780415263573 Video.

Malignant(Music).

A Quick Informative Video ██/██/██

For new A-Sync Researchers

Informative Video.

Glacier (Music).

Glacier 2 (Music).

People are Missing now!? 02/03/90

The People Missing ever since we opened The Back-Rooms.

Missing Persons (Music).

Missing Persons 02/03/90

In The Back-Rooms we explored the dimmension to find an individual dead. This wasn't on the last report. if anybody, blame him.

Missing Persons Video.

The John Doe Autopsy Report 02/05/90

The Autopsy Report to the individual in the "Missing Persons" Tape. Subject is male. Somewhere between 18-21 years old. but many people figured it could just be Nicolas Bolton. Somebody who went missing a few weeks or so before the autopsy report.

Autopsy Report Video.

The Situation 02/15/90

████████████████████████████████████████████████████████████████████████████

Look Around 02/27/90

Were making the threshold look cleaner. and we gave The Back-Rooms a few names. The Machine. The Door. The Complex. Hallways. We also Decided to look around The Complex a little more.

The Routine Layout Analysis 02/29/90

On the morning of Feburary 29th 11:35AM, a team of four researchers was sent into the complex to conduct a routine layout analysis. George Levy, Marvin Leigh, Ronald McCarthy, and Peter Tench.

The Routine Layout Analysis Video.

Peter Tench's Disappearence 03/01/90

At around 12:25PM, the group realized that they had lost track of Tench while traversing a previously accessed branch of hallways. As you’ll recall, this prompted an immediate withdrawal response back to standard, followed by several days of significant search efforts. However, those ultimately yielded nothing, and as far as any of us were concerned, Tench had simply vanished leaving no physical trace.

Setting up the Cameras 03/05/90

We're also working on a Observation Room outside of the Threshold, And we set up cameras around the Lateral Division, There was some Motion Detected. 7 modified video cameras are optimally positioned along lateral division A. Each camera has been modified to send out an alert and begin recording when motion or substanial noise is detected.

Motion Detected 03/05/90

The following is a compilation of all detected motion alerts received during the night of Monday March 5th.

19:39:43 03/05/90

MOTION DETECTED (Three researchers pass central division D)

20:26:43 03/05/90

MOTION DETECTED (returning researchers pass central division D)

21:02:12 03/05/90

MOTION DETECTED (Supervisor passes Camera 6)

21:14:04 03/05/90

NOISE DETECTED (Threshold barrier closed)

01:06:44 03/06/90

NOISE DETECTED (TBD)

02:13:35 03/06/90

NOISE DETECTED (Microphone Failure)

03:53:42 03/06/90

MOTION DETECTED

ARCHIVE.tar 03/11/90

Showing the Null Zones and Extras

Mar11_90_ARCHIVE.tar.

Sealed Away (Music).

Peter Tench's False Death 03/15/90

Peter Tench's Disappearence wasn’t something that we could disclose to the public, so roughly two weeks following his disappearance, our security team was forced to put together a more acceptable cause of death that would keep attention away from this institute and provide closure to the family, A Car Accident.

Peter Tench Has Been Found! 05/08/90